If you are ready to elevate your career with the LEED AP Building Design + Construction certification, you must pass the LEED AP BD+C exam. Then you must choose a proper study guide to make preparations. You should come to DumpsBase and download the latest LEED AP BD+C dumps (V10.02) as your learning materials. Our materials have helped thousands of candidates achieve their certification goals, and you can check the quality by reading the free dumps:

Equip yourself with the most comprehensive and up-to-date LEED AP BD+C exam dumps available today. To check more, you can continue to check the free dumps today.

Below are the LEED AP BD+C free dumps (Part 3, Q81-Q120) of V10.02 for checking:

1. A building owner is considering the installation of a solar thermal panel on the roof of the building. The initial cost of the system is higher than a conventional natural gas system.

Which of the following is true to make the renewable energy option economically feasible?

2. A project team seeking certification for a new school is attempting to achieve Materials and Resources Credit, Construction and Demolition Waste Management, Option 2. Reduction of Total Waste Material.

What strategy can be taken to meet the requirements of this credit?

3. Which of the following must be included in the Sustainable Sites Credit, Site Assessment?

4. In addition to Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 3. Building and Materials Reuse, salvaged materials contribute to the achievement of

5. When a project team sustainably develops a project site, the design should

6. What phase of the integrative process gives the team the greatest chance of success in meeting the project's environmental goals cost-effectively?

7. The project team has decided to substitute the flooring in the school gym with natural rubber flooring that has met the Sustainable Agriculture Standard. The cost of the substituted flooring is $80,000. The project will achieve

8. What aspects of each space should the LEED consultant consider to identify the regularly occupied spaces on a project to ensure that floor area values are utilized consistently across credits?

9. Which of the following projects is eligible to pursue the Energy and Atmosphere Prerequisite, Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?

10. A project has a potable water source as well as two alternative water sources.

Which of the following statements is applicable for a project using two alternative water sources?

11. The LEED project has a main entrance and two service entrances in an alley behind the building.

Which entrances need non-smoking signage and at what maximum distance from the door(s) can the non-smoking signage be posted?

12. A school wants to incorporate natural daylighting in classrooms on all sides of the building.

What can the project design team explain to the school district about how this strategy will affect the operational energy cost?

13. Which item is included in the reuse calculation for Materials and Resources Credit, Building Life-Cycle Impact Reduction?

14. A project in a cold climate does not want a highly reflective roof because they want the heat absorption.

How can this project comply with Sustainable Sites Credit, Heat Island Reduction?

15. What is the basis of energy consumption in determining the percentage of green power or carbon offsets?

16. The material cost for a project is $100,000.

What is the minimum material value needed to achieve Materials and Resources Credit, Building Disclosure and Optimization, Sourcing of Raw Materials, Option 2. Leadership Extraction

Practices?

17. According to the Integrative Process Credit, the discovery phase of energy-related systems should identify

18. When considering the Indoor Environmental Quality Credit, Thermal Comfort, what is the minimum percentage of building occupants that must have individual comfort controls?

19. Which of the following could be considered diverted construction waste?

20. A new five-story building with a 30,000 ft2 (2 800 m2) footprint is being designed on a previously disturbed100,000 ft2 (9 290 m2) site. The remaining on-grade surface will be 35,000 ft2 (3 250 m2) of asphalt parking, and 35,000 ft2 (3 250 m2) of native vegetated open space. To achieve a point for exemplary performance under Option 1 of Sustainable Sites Credit, Site Development - Protect or Restore Habitat, the design team will have to incorporate a native and/or adapted vegetated roof with a minimum area of

21. A project team is deciding on the impact of a proposed concrete walkway.

Which of the following will be impacted as a result of adding the walkway?

22. For a bicycle network to demonstrate compliance with Location and Transportation Credit, Bicycle Facilities, the bicycle network must connect to

23. The use of lead, mercury, copper and cadmium should be limited because they all

24. A LEED Building Design and Construction: Schools project pursuing Location and Transportation Credit, Green Vehicles elects to follow Option 2. Green Buses or School-Owned Vehicles.

What action must the project take to meet the Option 2 requirements?

25. Which federal agency designates Federal Renewal Community sites, which can be considered High Priority Sites for project development?

26. Which would contribute to compliance with Sustainable Sites Credit, Open Space?

27. A commercial new construction project consists of mixed space usage.

When deciding which LEED rating system to use, the LEED AP should follow which of the following rules?

28. What is the maximum number of points a project pursuing LEED for New Construction can achieve under Location and Transportation Credit, Access to Quality Transit?

29. If a commercial building is considered to have 100 peak visitors in a day, what is the minimum number of short-term bicycle storage spaces that must be provided to earn one point under Location and Transportation Credit, Bicycle Facilities?

30. Which of the following groups of documents is most likely to support both Indoor Environmental Quality Credit, Thermal Comfort, and Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control?

31. A design team is working on a new building project and is employing an integrated, whole-building approach. The architects want to increase the size of a glazed opening on the south facing wall.

Which team members are first affected by this change?

32. Who must be a member of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

33. Which of the following plumbing fixtures apply to the calculations in Water Efficiency Prerequisite,

Indoor Water Use Reduction?

34. Which of the following strategies will aid in reducing indoor water use?

35. Water Efficiency Prerequisite, Outdoor Water Use Reduction, Option 2. Reduced Irrigation, requires that a project's landscape water requirement be reduced by what percentage from the calculated baseline for the project site's peak watering month?

36. What document allows a LEED AP to register a project and sign the Certification Agreement?

37. Which of the following is the location of CO2 sensors in naturally ventilated spaces to comply with the Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

38. Which of the following should be analyzed when pursuing an Integrative Design Process focusing on

Energy-Related Systems?

39. The design team and project owner decided not to pursue Energy and Atmosphere Credit, Enhanced Commissioning, but would hire a Commissioning Authority (CxA) to oversee the requirements for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification.

What is a required responsibility for the CxA to achieve the stated objective?

40. U.S. Green Building Council (USGBC)'s vision for using LEED internationally includes


 