Updated LEED AP BD+C Dumps (V10.02) Should Be Your Reliable LEED AP BD+C Study Guide for Preparation – Read LEED AP BD+C Free Dumps (Part 1, Q1-Q40) to Check

You can pass the LEED AP BD+C LEED AP Building Design + Construction exam successfully to be your key career milestone. DumpsBase updated the LEED AP BD+C LEED dumps to V10.02 with 305 practice exam questions and answers, which are designed to replicate the real test experience and boost your chances of first-time success. The LEED AP BD+C dumps were updated to align with the latest exam structure and content updates. Developed by industry professionals with in-depth knowledge of the LEED AP BD+C exam blueprint, each question mirrors what you can expect on test day. The practice questions and answers in the dumps are not only accurate but also comprehensive, helping you avoid wasted effort on outdated or irrelevant topics. These updated dumps are clear, concise, and focused, ensuring that you’ll be fully equipped to pass on your first attempt. To check the quality, you can come to read the LEED AP BD+C free dumps online.

Below are the LEED AP BD+C free dumps (Part 1, Q1-Q40), the first part of the free dumps containing 40 free demo questions:

1. Which of the following buildings meets the Minimum Program Requirements for LEED certification?

2. Which of the following would be most useful to a school project that is attempting to pursue Water

Efficiency Credit, Indoor Water Use Reduction?

3. A project has total waste of 20 tons (18.1 tonnes) that includes the following:

・ 8 tons (7.3 tonnes) of recycled demolition steel and concrete

・ 2 tons (1.8 tonnes) of trees cleared from the site

. 3 tons (2.7 tonnes) of commingled scrap with 40% diverted

. 6 tons (5.4 tonnes) of used furniture donated to a non-profit organization

・ 1 ton (0.9 tonnes) of removed carpet and ceiling tiles sent back to the manufacturer

What is the percentage of diverted waste for Materials and Resources Credit, Construction and Demolition Waste Management?

4. A LEED Building Design and Construction project includes an outdoor stage for theatrical performances. In pursuit of Sustainable Sites Credit, Light Pollution Reduction the engineer has specified an LED fixture to illuminate actors on the stage while limiting light pollution.

Which of the following suggestions should the LEED AP give to the project owner?

5. During the early stages of a LEED for Schools project, the team was able to reduce the number of lighting fixtures in classrooms by 25% because the project team selected paint color whose light reflectance value was 75% instead of the initially proposed 64% value.

This strategy is an example of applying which of the following credits to the project?

6. The project team wants to modify the design of an office building copy room to minimize the risk of airborne contamination to the surrounding space. The design includes a separate exhaust, but due to design constraints the partition walls of the room cannot run deck-to-deck.

What can the team do to achieve Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies?

7. A project attempting to meet the preferred parking requirements for Location and Transportation Credit, Green Vehicles may provide what incentive to meet the requirements and highlight the project sustainable vehicle strategy?

8. Which one of the following represents quality transit service as defined in Location and Transportation Credit, Access to Quality Transit?

9. Increasing which of the following variables will require an increase in the outdoor airflow rate under Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

10. Which of the following innovation proposals is most likely to be successful to achieve an Innovation Credit?

11. What standard should an engineer use when establishing minimum ventilation rates for a new mechanically ventilated space to earn Indoor Environmental Quality, Minimum Indoor Air Quality Performance?

12. Under Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification, a current facilities requirements and operations and maintenance plan must contain which information necessary to operate the building efficiently?

13. For a task chair purchased for a healthcare facility, which portion of the product contributes toward Materials and Resources Credit, Furniture and Medical Furnishings?

14. Which of the following is required when documenting a LEED Pilot credit?

15. Which of the following sinks is classified as a private lavatory faucet under Water Efficiency Credit, Indoor Water Use Reduction?

16. An owner has insisted on using a non-native or non-adapted plant species on both the vegetated

roof and ground level.

What Sustainable Sites credit will this decision impact the most?

17. A LEED Building Design and Construction: New Construction office building's HVAC system includes hot water from a central utility plant. The central utility plant is owned and operated by a management company. The office pays a flat fee for hot water, included as part of the lease. The management company does not meter or invoice for actual hot water consumption. For the project to meet the requirements for Energy and Atmosphere Prerequisite, Building-Level Energy Metering, an energy meter must be installed for

18. LEED project boundaries that include multiple similar buildings which are all eligible for certification can be registered as which of the following?

19. Which system is eligible for the Energy and Atmosphere Credit, Renewable Energy Production?

20. A contractor is building a retirement community project. 30% of the building's product costs were derived from reused/salvaged materials or met recycled content criteria.

Which of the following credits can the LEED AP submit towards certification?

21. When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following information is required to be present in the Owner's Project Requirements (OPR)?

22. Plug-in task lighting will be utilized in a LEED project at all workstations. The task lighting is not included in the installed lighting power calculations for Energy and Atmosphere Prerequisite, Minimum Energy Performance since

23. Which of the following project types is required to consider the perimeter floor area instead of the regularly occupied floor area under the Indoor Environmental Quality Credit, Daylight calculations?

24. What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

25. Which of the following project types is required to consider the perimeter floor area instead of the regularly occupied floor area under the Indoor Environmental Quality Credit, Daylight calculations?

26. A newly constructed school has installed solar thermal systems and wind turbines on site.

To achieve the maximum number of Energy and Atmosphere points, which team members must be included?

27. When using the Integrative Process, what is the best way for the LEED AP to assess the impact of indoor and outdoor water consumption in a Building Design and Construction project?

28. In the step-by-step guidance for Location and Transportation Credit, Bicycle Facilities, which of the following requirements can define a bicycle network?

29. Which approach will contribute to maintaining compliance with Sustainable Sites Credit, Rainwater Management?

30. Which of the following strategies would be considered an acceptable minor improvement within the wetland buffer for Location and Transportation Credit, Sensitive Land Protection?

31. What reference standard is used to determine compliance with the Energy and Atmosphere Prerequisite, Minimum Energy Performance when the whole building energy modeling option is used?

32. Which is a benefit of earning Regional Priority credits?

33. A project elects to pursue Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 2. Diverse Uses because of the project's location in an amenity-rich area. The project features 18 uses overall, including at least four uses in three of the five use type categories.

What threshold must the project surpass in order to demonstrate exemplary performance for Option 2?

34. Which of the following strategies can be used to reduce the internal load of a building?

35. Discussing the project goals to help identify the credits and options that the team should attempt is an example of

36. Which rating system is appropriate for a new mixed-use building with 300,000 ft2 (27 871 m2) of residential units, 150,000 ft2 (13 935 m2) hotel and 50,000 ft2 (4 645 m2) of retail space?

37. The scope of analysis in Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4.

Whole-Building Life-Cycle Assessment is a

38. The project landscape architect suggests reducing the area planned for surface parking and replacing it with additional vegetated space.

What benefit would this strategy provide to the owner?

39. The maximum number of points for Water Efficiency Credit, Cooling Tower Water Use can be obtained by

40. What are the Storage and Collection of Recyclables requirements for only Retail projects under the Materials and Resources Prerequisite?


 

Choose the Latest LEED AP ID+C Study Guide to Make Preparations - DumpsBase’s LEED AP ID+C Dumps (V8.02) Help You Stand Out

Add a Comment

Your email address will not be published. Required fields are marked *