Get the Latest IDPX Dumps (V8.02) to Pass the Interior Design Professional Exam Quickly: Read IDPX Free Dumps (Part 1, Q1-Q40) First

Achieving the Interior Design Professional (IDPX) certification is great for professionals to excel in the tech field. It demonstrates expertise and opens doors to numerous opportunities in a competitive industry. Earning this certification requires successfully passing the IDPX exam, and DumpsBase offers the latest IDPX dumps (V8.02) to be your best study materials. The IDPX dumps (V8.02) contain 175 practice exam questions and answers, which are based on the latest exam objectives. With these updated and reliable Interior Design Professional Exam IDPX dumps from DumpsBase, you can confidently prepare for the exam and enhance your chances of passing it on your first attempt. The reliability and precision of our Interior Design Professional Exam IDPX practice questions have earned us the trust of countless candidates. If you still do not trust DumpsBase, you can come to check our free dumps online; the first part, containing 40 questions, is available today.

Read IDPX free dumps (Part 1, Q1-Q40) below to check the quality:

1. What is the MOST important consideration when specifying light fixtures for a retail store?

2. Which space would MOST likely have a dedicated HVAC system?

3. During a final walk-through, the interior designer notices that a decorative light fixture was not installed on a dimmer as specified. Where should the designer document the issue?

4. What spaces are typically grouped together in a multistory building’s service core?

5. A project is running behind schedule and over budget.

What should the designer do FIRST?

6. How are the actual riser and tread dimensions for a set of stairs determined?

7. Which of the following should be installed at regular intervals to avoid cracking of a GWB ceiling from building structural movement?

8. Information regarding product substitutions is found in the

9. What is the MINIMUM aisle width in retail areas conforming to universal accessibility standards?

10. During which phase is it BEST to consider integrating a security system in a project?

11. Referencing the table below, which two spaces could be combined as part of the space needs program?

Space

Days in Use

Hours of Use

Banquet

Friday to Sunday

10am to 10pm

Classroom

Monday to Friday

8am to 12pm

Art Gallery

Wednesday to Sunday

11am to 7pm

Exhibition Hall

Friday to Tuesday

5pm to 10pm

12. With regard to electrical systems, one responsibility of an interior designer is to provide the

13. The installation of which material has the lowest VOC emissions?

14. What floor finish would BEST support a passive solar design strategy in a hot arid climate?

15. Changes made to the contract documents during the bid (tender) process are documented in a(n)

16. A lien has been placed on a building.

What may be a probable cause for this action?

17. When developing a design, which BEST unifies the project and provides specific direction for the design?

18. During an office renovation, a financial firm wants to continue occupying the space while maintaining daily functions.

What is the BEST method for the designer to follow?

19. In a soft goods furniture specification, what information should always be included?

20. Which two functions are allowed with a one-hour fire separation in a fully-sprinklered building?

21. A mock-up is provided after client review of the finishes and systems furniture components. Upon inspection of the mock-up, the client observes that the fabric on the panels does not match their corporate standards.

What should the designer do NEXT?

22. On a small project with an unclear scope involving multiple stakeholders, which fee method would be BEST utilized by the designer?

23. When calculating the usable area of a multi-tenant floor per BOMA standards, where should the designer establish the boundary between a tenant space and common corridor?

24. On a multi-tenant floor, what is the usable area when calculating square footage according to Building Owners and Managers Association (BOMA) standards?

25. A designer who is working on a non-profit community center in a historic building has met individually with the project’s benefactor, the community center’s board, the center’s director and staff, local community members, the municipality’s historic preservation committee, and the retained contractor.

Which of the following is the designer’s GREATEST challenge?

26. Contract documents serve as the legal contract between

27. What is the term for a full-scale representation of products or construction features that may be required in bid (tender) documents?

28. An office client tells the designer they would like their staff break room to be visible from the reception area to convey a relaxed environment. This request reflects the client’s

29. What is the term for a continuous path of travel from any point in a building or structure to the open air outside at ground level?

30. During construction, the general contractor notices conflicting information between the construction drawings and the specifications. The FIRST step the contractor should take is to

31. A contractor has notified the designer that the existing paint in a space tests positive for lead.

What is the correct course of action?

32. While visiting a job site, it is observed that the junction boxes for wall sconces are mounted at the wrong height.

What should be done?

33. Which consultant should be contacted to correct omissions on the drawing shown below?

34. Plumbing traps are an essential feature of sanitary drains because they prevent

35. What is one way to reduce indoor air pollutants?

36. The design for a new corporate office has wood wall panels with aluminum reveals.

What sequence below will result in the MOST efficient installation?

37. When reviewing the general contractor’s pay application, the designer should approve the amount for

38. What should a designer recommend to BEST save on construction costs in a corporate office project with a tight improvement allowance?

39. What kind of schedule shows which tasks are the highest priority and what the effect will be on the overall project if the tasks take longer than estimated?

40. When the owner/contractor agreement is executed, which documents specifically form the contract documents?


 

Add a Comment

Your email address will not be published. Required fields are marked *