Dell D-PE-OE-23 Dumps (V9.02) Are Your Reliable Study Materials to Pass: Continue to Check the D-PE-OE-23 Free Dumps (Part 3, Q81-Q120)

DumpsBase offers Dell D-PE-OE-23 dumps (V9.02) to be your reliable study materials, which help you pass the Dell Technologies PowerEdge Operate 2023 exam on the first attempt. The dumps contain real questions and verified answers with a 100% success guarantee, making your exam pass smoother. If you want to check the quality of the dumps, you can read our free dumps first:

After reading all these sample questions, you can trust, our D-PE-OE-23 dumps (V9.02) will ensure that your exam preparation is effective. Choose DumpsBase and prepare for your Dell Technologies PowerEdge Operate 2023 D-PE-OE-23 exam confidently. Continue to focus on DumpsBase; we will share more demos today.

Below are the Dell D-PE-OE-23 free dumps (Part 3, Q81-Q120) of V9.02 that can be continued to read:

1. What type of screwdriver is required to remove the processor heat sink module?

2. An engineer needs to upgrade a Dell EMC PowerEdge R440 server from a single PSU to dual PSU configuration. There are unused PSU modules from PowerEdge R430 and R420 servers available, and they have the same wattage ratings.

What should the engineer do to complete the task?

3. A server administrator needs to access the iDRAC8 default interface. They are not using DHCP. They open a web browser and prepare to enter an IP address.

What IP address should they use?

4. A technician needs to install the OS on a server remotely using iDRAC.

What is the minimum iDRAC license required to perform this task?

5. A technician needs to configure the Lifecycle Controller network settings with a static IP address. A limited number of static IP addresses are available for use.

Which previously assigned IP address can also be used for the Lifecycle Controller?

6. Which memory operation modes are supported for a Dell PowerEdge R660?

7. A technician has a 13G system that is giving NO video to a crash cart connected to the front VGA port. The LCD is NOT reporting any errors.

The system reports ‘CPU Resetting’ messages sporadically in the lifecycle log. The iDRAC runs an Express license. The technician needs to most efficiently determine if the system is completing POST despite the video issue.

Which two steps should the technician take to perform this task? (Choose two.)

8. A Dell EMC PowerEdge 13G server is being controlled through a secure port by iDRAC8.

What login connection options are available on server using a secure port?

9. A technician needs to analyze a server that is using more power than expected. The server is part of a cluster that runs jobs between 8 AM and 5 PM. The cluster is not used at other times of the day. The server runs an unsupported OS. Performance while jobs are running is a key consideration.

Which option should the technician choose from within System Profile Settings within System Setup to address this issue?

10. Case Study 1

A company has several independent business units that operate globally. The company has consolidated its IT infrastructure services and operations. Common infrastructural services which include IPAM, DNS, NTP, DHCP, and SMTP have been consolidated.

The company has complimented its infrastructure development by investing in Dell EMC Isilon clusters to host its user's home and group directories and for compliance archival purposes required by individual business units. The IT operations are located in India and the United States with its primary data center facilities co-located between New York and Texas.

The company has a total of 60 AD forests:

- 1 main domain

- 55 domains have one-way trust relationships with the main domain

- An additional 4 domains do not have any trust relationship with no future plans of establishing trust relationships with the other domains.

Users of different AD domains use different FQDN to access their corresponding file services. Additionally, the company does not plan to consolidate the AD domains and each domain uses a different IP subnet.

The users of the domains with no trust relationships have a compliance archival requirement. The company wants to all data to be replicated between New York and Texas.

How many tenant Access zones will be required?

11. A technician needs to update the iDRAC license on a PowerEdge R740 server from Express to Enterprise.

The server has the following components:

- 2x CPUs

- 384 GB RAM

- 6x 1 TB drives

- 1x PSU

The server is powered down but connected to active AC. The user wants it to stay powered down and not connect to any networks. No errors are presently displayed.

How can the technician upgrade the license?

12. Where is the data stored to allow Easy Restore to successfully complete a system board replacement?

13. Beginning with which generation Dell EMC PowerEdge server is the NDC available?

14. A user installed OME on a PowerEdge R640 server. OME has discovered and is currently monitoring another 30 remote PowerEdge 14G servers.

Each server has the following configuration:

- 2x CPUs

- 384 GB RAM

- 6x 1TB drives in a RAID 6 virtual disk

- No hot spare drive

- PERC

- vFlash

- iDRAC9 Express license

At 9 PM on Monday evening, one of the remote servers has a disk failure but stays operational. The administrator monitoring OME does not find out about the issue until 5 PM in the following Friday. They place a support call to investigate why OME was not informed about the disk failure before then.

What is the reason for this issue not being reported to OME?

15. Which sections are included in the iDRAC Troubleshooting tab?

16. A technician is creating a virtual disk in the DRAC (2x 4 TB NL-SAS in RAID 1) to install Windows 2016. They manually boot to the OS installation media without using the Lifecycle Controller OS Deployment wizard. Only the first 2048 GB on the virtual disk can be partitioned.

How should the technician obtain access to the remaining 2 TB (approximately) of storage?

17. Refer to the exhibit.

A technician tries to apply a BIOS update through the iDRAC web interface on a server using the Linux Dell Update Package file BIOS_2H4CC_LN_2 0.2.BIN. The error shown occurs.

How should this error be fixed?

18. A technician needs to change the iDRAC password on a Dell EMC PowerEdge 14G server in a lights-out datacenter. The be rebooted because it is in production. The iDRAC is configured with the default credentials.

How could the technician change the iDRAC password?

19. A server is configured in a 1+1 power configuration with both PSUs connected to a single PDU.

Which redundancy options does this configuration supply?

20. Which two tools provide a user interface to manage the Boot Optimized Storage Solution (BOSS) cards? (Select 2)

21. A technician needs to remotely update the iDRAC with Lifecycle Controller firmware. They have downloaded the latest iDRAC firmware to the management station and connected to the iDRAC GUI.

What step is required to complete the update?

22. Case Study 3

A financial services company has file sharing workflows and 2000 home directories which include 70% Microsoft Windows and 30% Linux. The Security team is also interested in credit card usage data analytics such as point of sale, geolocation, and authorization and transaction data. Home directories and file shares do not require D@RE or SEC compliance.

However, due to the sensitivity of the credit card data, the company requires D@RE for credit card information and must adhere to the U.S. SEC 17a-4(f) compliance standards. Additionally, they are interested in auditing user access and anti-virus features.

The compute and storage environment consists of the following:

- 200 TB of Fibre Channel drives on NetApp ONTAP 7

- Environment is expected to grow 200 TB over the next three years

Which combined solution addresses the company's requirement for D@RE and U.S.SEC 17a-4(f)?

23. Which iDRAC menu includes the detailed log files required to troubleshoot a hardware issue on a Dell EMC PowerEdge server?

24. A technician needs to set a server to always attempt PXE boot before booting to the hard drive.

What two items does the technician need to set to achieve this? (Choose two.)

25. An existing server is transferred to a new location. The technician is directed to change the information displayed on the LCD located on the front bezel to show the ambient temperature.

What is a consideration for the technician?

26. Refer to the exhibit.

A system administrator wants to monitor information about the system using their smartphone and a Bluetooth connection. LED labeled 3 on the control panel is solid white.

What does the LED indicate?

27. What does OBPAR allow on a PowerEdge MX750c?

28. A company's servers were ordered with iDRAC Enterprise with vFlash. The server profile was backed up after the first boot. Changes have been made to the server BIOS settings and firmware versions, which have resulted in many performance issues.

What is the most efficient way for the technician to address the performance issues?

29. A technician resets the iDRAC but when they attempt to log back in to the iDRAC is offline.

Why is the iDRAC offline?

30. A technician has the ISO image of an OS that they need to install on a server in a remote location. They are already logged into the iDRAC.

How should the technician install the OS?

31. From PERC8 to PERC9, the maximum number of individual drives upon which a virtual disk can be created changed.

How did this value change?

32. A user has a number of PowerEdge servers and installs OME on a remote system to monitor the servers. When attempting to discover one of the servers, the discovery process is unsuccessful. The user accesses the Troubleshooting tool to establish that the communication pathway is correct.

After entering the server iDRAC IP address, which network protocol should be selected to communicate with the iDRAC?

33. A technician is tasked to perform a RAID Level Migration (RLM) of a RAID 5 array to a RAID 6 array. They back up data and look in iDRAC Storage and find that the current RAID 5 array is sliced into two virtual disks.

What should the technician do to achieve the desired RAID level?

34. A technician needs to initially configure a server from a bare metal condition in the following areas:

- Processor settings

- Disk configuration

- iDRAC network settings

The technician can only reboot once to achieve these tasks.

Where should the technician configure these settings? (Choose three.)

35. Which characteristic of system management enables a company to reduce costs?

36. On a PowerEdge R640 server, the System Lockdown mode has been enabled. Certain features are no longer available in the System BIOS utility or IDRAC GUI.

Which other feature is no longer available?

37. A system administrator is trying to connect with a mobile device to a Dell PowerEdge 16G server using Quick Sync 2. They failed to make a connection.

What is the reason for the failure?

38. An engineer needs to install an additional PSU on an existing, single PSU Dell EMC PowerEdge R740. They complete the initial installation and cabling procedures. They connect an AC cable and the power distribution unit produces normal AC output. The engineer checks power management and sees that the new PSU is in the Failed state.

What task should be completed to troubleshoot this issue?

39. A new server with default iDRAC network configurations is plugged into a segregated management network configured for 10.0.0.x/24. The technician cannot connect to the iDRAC.

How can the on-site technician configure the iDRAC for network access?

40. A technician is deploying a server.

What should they do once the server is fully configured and deployed?


 

Dell D-UN-DY-23 Dumps (V14.03) with Trusted Questions and Answers: Continue to Check the D-UN-DY-23 Free Dumps (Part 3, Q81-Q120)

Add a Comment

Your email address will not be published. Required fields are marked *