Trust, the latest LEED AP BD+C study guide (V10.02) from DumpsBase is meticulously prepared for the LEED AP Building Design + Construction exam, enabling you to enhance your skills and confidently attempt your exam. To meet your requirements and ensure your well-preparation, selecting the most current dumps is an efficient way. This will help you stay focused on your preparation, and the LEED AP BD+C exam questions will encourage you to work effectively. Quickly achieve your goals by effectively completing all preparation tasks using the authentic study guide. Read the LEED AP BD+C free dumps (Part 1, Q1-Q40), and find that the LEED AP BD+C study guide of DumpsBase is perfect for preparing for the LEED AP Building Design + Construction exam, allowing you to obtain an outstanding score on your first attempt.

Below are the LEED AP BD+C free dumps (Part 2, Q41-Q80) of V10.02 for reading:

1. At the time of registering a project in LEED Online, Regional Priority credits are determined based upon the project's

2. Which of the following activities must be prohibited within a building as a prerequisite to LEED certification?

3. What is a benefit of including the public in a charrette for a new school before the pre-design phase?

4. Which of the following contributes to the value of the commissioning process?

5. What LEED Building Design and Construction rating system mandates a preliminary LEED meeting with the principal members of the project team to create a LEED action plan that includes the anticipated certification tier, targeted credits and parties responsible for each credit?

6. Which of these is a method to assess the regional context of a building's design for sustainability?

7. To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate

8. A tenant of a new office building will require 100 workstations per floor. Each floor will have two bathroom facilities and one conference room.

How many lighting control devices with at least three lighting levels per floor are required to comply with Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control?

9. Which of the following standards needs to be followed to comply with Indoor Environmental Quality Credit, Thermal Comfort?

10. Which of the following documents contains the design team's interpretation of the Owner's Project Requirements?

11. For Energy and Atmosphere Credit, Advanced Energy Metering, what is the minimum amount of time that the metering system should store data?

12. Which energy efficient lamp type is free from mercury?

13. Which of the following will contribute to reducing the heat island effect?

14. In the calculations for Water Efficiency Credit, Outdoor Water Use Reduction, food gardens

15. The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction ensures that eligible newly installed plumbing fixtures will

16. Which of the following products are eligible for a WaterSense label?

17. For schools intended for grades eight and below (or ages 14 and below), which of the following scenarios would demonstrate compliance with Location and Transportation Credit, Access to Quality Transit, Schools, Option 2. Pedestrian Access?

18. The owner has stated a desire to provide a variety of non-automobile commuting options for the future occupants.

What credits should the LEED AP suggest to meet this goal?

19. Which of the following strategies is allowed under Energy Atmosphere Credit, Renewable Energy Production, and will help a project achieve Energy Atmosphere Credit, Optimize Energy Performance?

20. A LEED AP submitted a Preliminary Design and Construction review and has received a review comment and technical advice on Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning.

Which of the following actions should the LEED AP do if the project continues to pursue LEED certification?

21. Which of the following is required for a cooling tower or evaporative condenser in Water Efficiency Prerequisite, Indoor Water Use Reduction?

22. A design team pursuing LEED for a new office building project calculated that with the water fixtures specified for the project, a 24% water reduction can be achieved compared to the LEED baseline.

What does this mean to the team in terms of pursuing LEED?

23. Sustainable Sites Credit, Site Assessment requires evaluation of

24. What is the average flush rate for a dual flush toilet with a high flush rate of 1.6 gpf (6 lpf) and a low flush rate of 1.05 gpf (4 lpf)?

25. A new commercial building is being designed to use small capacity air handling units. To meet the requirements of the Carbon Dioxide Monitoring strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Environmental

Quality Strategies, where would CO2 monitors need to be located?

26. A luxury hotel project is in the design phase and is located on a scenic waterfront. It is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies.

Which of the following credits would be desirable considering the location of the project?

27. Selecting a high-reflectance interior paint which is compliant with South Coast Air Quality Management District (SCAQMD) Rule 1113 can help contribute towards which two credits?

28. A Photovoltaic (PV) system was installed on a 35,000 ft2 (3 252 m2) project.

What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification?

29. What stage of LEED for Neighborhood Development certification listed below is eligible for points under Building Design and Construction: New Construction, Location and Transportation Credit, LEED for Neighborhood Development Location?

30. A new school with a 20 car parking lot has set aside four preferred parking spaces for green vehicles.

What else must the project team provide to achieve Location and Transportation Credit, Green Vehicles?

31. A design team is pursuing Indoor Environmental Quality Credit, Indoor Air Quality Assessment. The building is 1,000 ft2 (93 m2) and has a 10 ft. (3 m) ceiling height.

In order to earn the credit, what is the required volume of supply air for the entire building flush-out?

32. Which of the following Water Efficiency credits differ between LEED Building Design and Construction: New Construction and LEED Building Design and Construction: Healthcare?

33. Which of the following is a leadership extraction practice that rewards projects for choosing materials with closed-loop recycling and take-back programs in LEED?

34. Which strategy should be employed to improve daylighting when designing a new building?

35. What are the requirements of commercial projects for long-term bicycle storage under Location and Transportation, Bicycle Facilities - Bicycle Storage and Shower Rooms?

36. A Healthcare Project is constructing a new building adjacent to an existing LEED Certified hospital facility. The new building's location is on the same hospital campus as the certified facility. The entire hospital campus was analyzed with an Environmental Site Assessment (ESA) as part of the certified facility's project scope. The new building project needs to complete a new Phase I ESA if

37. Which of the following project team members should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning?

38. The Sustainable Sites Credit, Heat Island Reduction takes into account both new and three-year aged Solar Reflectance Index (SRI) values for roofing material because

39. Which of the following statements is correct when defining the project boundary?

40. A project's massing and site orientation can have a direct impact on which of the following prerequisites?


 