Proven CPIM-8.0 Dumps (V11.02) Should Be Your Quick Tips for Guaranteed Pass: Check CPIM-8.0 Free Dumps (Part 3, Q81-Q120) Online

Trust, the CPIM-8.0 dumps (V11.02) from DumpsBase have been proven as your quick tips for guaranteed pass. At DumpsBase, you can download the dumps and get the intelligent and adaptable study tools, including the CPIM-8.0 exam dumps PDF and Software, which are designed to match your personal learning style. Before downloading the CPIM-8.0 exam dumps PDF and software, you can read our free dumps first:

These demos confirm that your preparation materials are valid. We regularly update the dumps to align with the latest exam objectives, so you can study with the most current CPIM-8.0 syllabus and structure. By choosing the proven CPIM-8.0 dumps (V11.02) today, you’ll practice with realistic, exam-like questions that reflect the actual test format. With continuously updated content, you stay ahead of exam changes, prepare more effectively, and boost your chances of passing on your first attempt.

Today, we will continue to share the CPIM-8.0 free dumps (Part 3, Q81-Q120) of V11.02 online:

1. If the total part failure rate of a machine is 0.00055 failures per hour, what would be the mean time between failures (MTBF) in hours?

2. A company with stable demand that uses exponential smoothing to forecast demand would typically use a:

3. Which of the following stock location systems would you use in a repetitive manufacturing, lean environment?

4. Which of the following outcomes Is a benefit of mixed-model scheduling?

5. A logistics manager Is faced with delivering an order via rail or truck. Shipping via rail costs S300 and takes 14 days. Shipping via truck costs $600 and takes 3 days.

If the holding cost is $40 per day, what is the cost to deliver the order?

6. It takes an average of 3 hours to set up a model and 1 hour to run, but depending on the complexity of the models, the setup time can be significantly different. Last week. 2 modelers were working on different projects. Each worked 40 hours. One modeler finished 5 models a day, and the other finished 1 model a day.

What was the demonstrated capacity last week?

7. Management should support investments in new process technologies that:

8. Which of the following statements best characterizes enterprise resources planning (ERP) systems?

9. Increased use of third-party logistics (3PL) services is likely to have which of the following effects on a firm's balance sheet?

10. Which of the following measurements indicates there may be bias In the forecast model?

11. The master schedule is an Important tool in the sales and operations planning (S&OP) process because it:

12. If all other factors remain the same, when finished goods inventory investment is increased, service levels typically will:

13. Which of the following actions will result In lower inventory levels?

14. Which of the following product design approaches are likely to reduce time to market for a global supply chain?

15. Exhibit:

A company has prioritized customers A, B, and C, filling orders in that sequence.

What are the impacts to customer service levels for customers B and C?

16. For a process that is outside its upper control limit (UCL), which of the following techniques would best be used to return the process under control?

17. The planned channels of Inventory disbursement from one or more sources to field warehouses are known as:

18. Which of the following statements is an assumption on which the economic order quantity (EOQ) model is based?

19. Which of the following activities is an example of collaboration between suppliers and operations which would give more lead time visibility?

20. One of the most useful tools for analyzing the sustainable footprint is:

21. The costs provided in the table below are associated with buying a quantity larger than immediately needed.

What Is the total landed cost based on this table?

Cost Category Cost

Custom fees$125

Freight$700

Warehouse rent$200

Matenal cost$500

22. Which of the following environments is most suitable for the use of kanban systems?

23. An effective approach to projecting requirements for materials with long lead times Includes which of the following options?

24. In the design and development of a manufacturing process, process engineers would most likely be responsible for decisions relating to:

25. What activity is a useful element in the change process?

26. Fishbone diagrams would help a service organization determine:

27. The time spent In queue by a specific manufacturing job is determined by which of the following factors related to the order?

28. One advantage of adopting a supply network perspective Is that it:

29. A company implementing a localized multi-country strategy to increase market share should engage in which of the following actions?

30. Based on the above table, calculate the mean absolute deviation (MAD).

31. The horizon for forecasts that are input to the sales and operations planning (S&OP) process should be long enough that:

32. Under which of the following conditions is excess capacity most likely a good substitute for safety stock?

33. Given the following data, calculate the appropriate takt time:

34. One way to mitigate liability risk in the supply chain is to:

35. What is the main negative effect of changing the due dates of open orders?

36. Given the bill of material (BOM) information below and independent requirements of 10 pieces (pcs) per week of Component A and 20 pieces (pcs) per week of Component B, what is the weekly gross requirement of component F?

37. Which of the following statements is true about total productive maintenance (TPM)?

38. If fixed costs are §200,000 and 20,000 units are produced, a unit's fixed cost is §10.

This is an example of:

39. Which of the following conditions is most likely to result in planned production that is greater than the total demand over the sales and operations planning (S&OP) horizon for a product family that is made to stock?

40. A newer automotive supplier has not fully developed its information technology (IT) systems. The supplier has Just received a contract from a large automotive manufacturer which requires the supplier to use electronic data interchange (EDI) transactions for receiving orders, sending advance ship notices (ASNs), and receiving invoice payments.

What strategy can the supplier adopt to immediately meet the EDI requirements?


 

Arm Yourself with APICS CPIM-8.0 Dumps (V11.02) Today: Continue to Share CPIM-8.0 Free Dumps (Part 2, Q41-Q80) Today

Add a Comment

Your email address will not be published. Required fields are marked *