Prepare for Your Certified Technology Specialist (CTS) Exam with Updated CTS Dumps (V9.02): Study CTS Free Dumps (Part 1, Q1-Q40) First

You can prepare well for your Certified Technology Specialist (CTS) exam with the most updated CTS dumps (V9.02) of DumpsBase. We updated the dumps with 254 practice exam questions and answers to ensure your success. A complete go through of the Certified Technology Specialist (CTS) exam dumps will greatly benefit you in resolving uncertainties about the real exam questions and answers. With DumpsBase InfoComm CTS dumps (V9.02), you’ll have everything you need to achieve the Certified Technology Specialist (CTS) certification on your first try. Additionally, we have free dumps online to help you check the quality of the V9.02. Today, we will share the first part, including 40 free demo questions in total.

Below are the CTS free dumps (Part 1, Q1-Q40) of V9.02 to help you check the quality:

1. Refer to the exhibit.

According to the Gantt chart pictured, the Project Manager should wait to start Activity C until which predecessor has been reached?

2. As part of a service agreement offering, wfwt PRIMARY role do preventive maintenance visits (PM/PMV) play?

3. Which frequencies are amplified by a subwoofer?

4. HOTSPOT

Which section of the Ohm's Law chart should be used to calculate values expressed in Ohms? Select the answer by clicking anywhere within the correct quadrant.

5. When doing a site survey, it is MOST IMPORTANT to consider the client's

6. As the height of a character increases on a display.

7. Assuming that the speakers in the picture on the LEFT are 8 Q drivers, what is the impedance of the speaker system on the left?

8. During a routine service visit, an engineer notices an LED indicator on a projector's front panel blinking regularly.

What should be done?

9. When connecting a condenser microphone, what MUST be included in die system design for it to operate?

10. When creating an estimate for a request for proposal (RFP), what is the FIRST tiling that should be done?

11. Network Quality of Service (QoS) is defined as

12. A saeen is 144 in (3658 mm) wide and the throw ratio is 2.3:1.

How far from the screen should the projector be placed?

13. Which method of control is supported by HDBaseT?

14. During project delivery and after completion, it is important to ensure correct management of control system code so that

15. Assuming a 10' (3 m) ceiling, what is the approximate volume of this room?

16. The BEST way to ensure that a project is on budget is to

17. Maintaining AV operations includes which of the following?

18. How frequently should a personal fall arrest harness be inspected?

19. When discussing a proposed audiovisual project with a new customer, it is important for the salesperson to FIRST

20. Project documentation states the system must logically Isolate control and media networks.

What piece of network equipment should be used?

21. To help end users remember key points of the training, the training documentation should include

22. When an audio device can no longer accurately reproduce the audio signal, It is called

23. Which kind of drawing should a technician refer to in order to determine how to hang a loudspeaker line array?

24. During the site survey, the client indicates that the space that will become a rear projection room is currently an off-white color.

What should be recommended to the client?

25. During an initial customer visit, it is important to determine whether or not one is

26. The contrast control sets the

27. The circuit on the RIGHT is an electrical drawing of what type of speaker system?

28. When planning to use audio equipment on a converged enterprise network, it may be desirable to separate broadcast domains in order to

29. An application requires Its equipment to be operational 24 hours a day and the owner considers the system mission critical.

What type of warranty would be BEST for the equipment?

30. A client has ordered a large project from a company. This project has several critical components and a fixed schedule.

Which of the following will be VITAL for ensuring that the company meets the deadlines?

31. Before confirming an anticipated completion date with the customer, it is MOST important to

32. Which of the following is addressed within the Needs Analysis part of the AV Design process?

33. What is the MAIN difference between OLED displays and LED displays?

34. During a site survey of a facility to be upgraded or modernized, it is important to check wireless microphones that may be redeployed to ensure

35. When calibrating a loudspeaker system, which weight setting on the SPi. meter is used for its mdus>on of low frequency sound levels in the measurement?

36. A client has ordered a large LED video wall to be installed in an existing board room.

What should be the integrator's MAIN operational concerns?

37. Assuming that the screen and projector are both Ethernet controllable devices, where does the control system for the AV solution need to exist?

38. Your client has requested a 50inch monitor be mounted on the south wail of this boardroom.

Which two recessed lights will need to be separated into the r own zone in order to turn them off when the monitor is on?

39. What is the name for a written, non-technical narrative that explains system functionality?

40. Knowledge of the overall room function as envisioned by the client provides a


 

Add a Comment

Your email address will not be published. Required fields are marked *