Continue to Check the CTAL-TM Free Dumps (Part 2, Q41-Q90) Today: You Can Confirm That the CTAL-TM Dumps (V10.02) Are Reliable

The CTAL-TM dumps (V10.02) with real questions and verified answers are your essential materials to prepare for your Certified Tester Advanced Level Test Manager (CTAL-TM) certification exam. These updated CTAL-TM dumps make your success possible, helping you understand the exam objectives thoroughly. You may have read our CTAL-TM free dumps (Part 1, Q1-Q40) of V10.02 online, then you can find our dumps are reliable for learning. Also, you can trust that the most updated CTAL-TM dumps (V10.02) will acquire treatment within you achieve success; all you will need to do is go carefully with ISTQB CTAL-TM exam questions and answers. Today, we will continue to share the free demos online. Then you can read more about the V10.02 and decide to get the full version of DumpsBase’s CTAL-TM dumps.

Continue to read our CTAL-TM free dumps (Part 2, Q41-Q90) of V10.02 below:

1. When Is the metric for the percentage of requirements coverage defined?

2. One of your team members is struggling to identify the requirements to be tested for a project The requirements documents are not conventional but you have determined that the data is there. If they do some digging to find it.

Given this information in what competence area does this person need to improve?

3. Which of the following best describes the appraisal costs in the cost of quality'

4. What is a "depth-first" risk-based testing technique? [1]

5. Which of the following is a typical use of risk analysis? [1]

6. While mining the defect database for patterns of problems in the last release, a Test Manager notices that many of the most damaging failures were caused by defects injected during the low-level design phase.

Which of the following actions will likely give this project the most effective solution to this problem? [3]

7. You are a Test Manager on a new project. The software that is being created will be used to control the projectors in movie theaters. This is a time critical project because the software must be released before the Christmas holiday season which has the highest movie attendance of the year.

You have decided to implement a review process for the work products that are a part of this release to save both time and money. In order to expedite the training, you brought in a consultant to train the participants and moderators in proper review processes. Your team is enthusiastic about participating in the reviews.

Your manager is questioning the money you have spent on this training effort. He wants to know how you intend to justify the expense when you present your numbers at the annual budget meeting in February.

What would be a reasonable way for you to justify the cost of the training and the reviews when you present your information at the budget meeting? [3]

8. What is the purpose of lest control?

9. You have been looking at the actual vs expected defects in one high risk area of the software The actual is much higher than the expected value.

What should you do?

10. You have decided to help your team improve their skills. One of their assignments is to mentor a junior member of the team.

Which competency should you expect the mentor to develop during this exercise?

11. You are testing a new product that will turn on the windshield wipers of a car when the sensors detect there is moisture on the windshield. Depending on the information returned from the sensors, the wipers will be turned on at one of the following speeds: slow intermittent, medium intermittent, fast intermittent, slow constant, medium constant, fast constant.

Your team has identified the following test condition:

Test Condition 1.1.1 - Verify that the windshield wipers can go from slow constant to fast constant speed when the amount of moisture increases appropriately.

Your team has defined the following steps for a test case for this test condition:

1. Set the moisture sensor to request slow constant

2. Increase the moisture to set the sensor to request fast constant

3. Verify that the wipers respond with fast constant speed

Given this information, which of the following statements is correct? [2]

12. You are the Test Manager for a critical system and are using a risk-based approach for this project.

Which of the following would most clearly convey the current status to project stakeholders? [3]

13. Test results are reported as "Requirements tested, passed, and failed".

What test strategy are you using? [1]

14. Your team has been working on an Agile project for two months. There is a retrospective at the end of each sprint One of the data items reviewed is how many defects are being caught by users rather than by testers. The test team is being blamed for these escapes

What do you need to do to make these sessions more productive?

15. Which of the following Is a way in which risk analysis drives test analysis?

16. You are reviewing the project's traceability matrix after the first cycle of testing. You have discovered that new requirements have been introduced and others have changed.

What should you do? [2]

17. You are a Test Manager on a new project. The software that is being created will be used to control the projectors in movie theaters. This is a time critical project because the software must be released before the Christmas holiday season which has the highest movie attendance of the year.

You have decided to implement a review process for the work products that are a part of this release to save both time and money. In order to expedite the training, you brought in a consultant to train the participants and moderators in proper review processes. Your team is enthusiastic about participating in the reviews.

The project is in the early planning stages. As the review leader, what is an appropriate activity for you to be doing at this point in the project? [3]

18. Your organization has decided to augment your testing team with an offshore team. The offshore team members are experienced testers who are experts in the domain of the system under test Your team is worried about the offshore team taking their jobs and they are resistant to the change You need to pick three of your team members to be the ambassadors for the new team

Which competences will be most important for your ambassadors to possess?

19. What occurs In the retrospective closing?

20. You have been asked to make a recommendation on deployment readiness on the software your team has been testing.

You have the following metrics:

Given this information what is a critical metric you are missing?

21. Your company is installing a third-party enterprise-wide business software package. This is the first time the company has done anything like this.

Which technique would be the best one to use to estimate the testing effort? [3]

22. During what step of the Fundamental Test Process should you define the methods to be used to collect test metrics? [1]

23. Which of the following is a factor that is likely to increase the test estimate? [1]

24. In what way is the operations team usually Involved In testing7

25. Your manager has decided that your team of manual testers should all become test automation engineers Your team is much stronger in analysis than In technical testing so you are concerned about their ability to adapt.

What tool capabilities could help with this transition?

26. You are working with a development team who have a CI/CD pipeline implemented. They want to integrate your team's existing test automation into the pipeline to augment their unit tests so they will have continuous testing. They have already determined that this is technically possible with the tool you are using but with require some changes to the test automation framework to integrate the results reporting

What will your team need to make this happen?

27. You have been promoted to Test Manager within your company. Your new manager states that your test team utilized a risk-based test approach for the last release but in production, a number of serious failures in lightly tested areas have occurred.

What would be your first action prior to the start of the next test phase for the next release? [3]

28. When scheduling performance testing, which of the following approaches would be most advisable? [1]

29. Which of the following metrics would be most beneficial to collect to determine the effectiveness of a review process? [2]

30. Which of the following is likely to occur if reviewers do not have an adequate level of technical knowledge? [1]

31. You have been assigned t o a project that has a very tight schedule. In fact, given your first analysis you do not think the planned test execution can be completed within the schedule There is no time allowed for defect fixing or for repeating tests. Regression testing has been left out of the planning entirely There is no time to develop test automation. The team has agreed that this Is not the way to run a project, yet they are stuck with the current schedule

Given this information what is the best way to proceed with the testing to try to meet the deadline with the best outcome1?

32. You have directed one of your testers to construct a "smoke test" to execute against new builds prior to starting formal testing.

This is an example of which software development lifecycle activity? [1]

33. You are working on a project where the business part of the organization works traditionally with defined requirements, but the development team follows an Agile model Neither team plans to change their approach.

What is the proper name for this type of project approach?

34. You are the Test Manager for a new product that is being developed according to an iterative lifecycle. At this point, you have 100% of your smoke tests automated, 20% of your functional tests and 50% of your regression tests. Your iterations are four weeks long. You are finding that with each iteration significant maintenance is required for your automated tests and you are not able to complete the testing within the planned timeframe. The test plan you created at the beginning of the project indicates

that all automated tests should be run before any manual tests.

Which of the following is a reasonable change to this plan based on how the project is going? [2]

35. Which of the Mowing should be used to understand the context of testing within an organization?

36. Your company just won a contract to create a new sales application and has committed to a very aggressive delivery timeline. Due to the quick turnaround your primary stakeholder wants to be heavily involved in the design and is very anxious to see the outcome. Because of this, your company has decided to use a spiral development approach. You have a defined test policy and typically use an analytical approach to testing, however, this approach will not work with the development approach.

What test strategy should be utilized? [3]

37. Which of the following statements is true regarding Fault Tree Analysis? [1]

38. 1.You have assembled the following cost of quality numbers 200 defects were found prior to release and 100 were found after.

Given this information what is the total cost of quality for this project?

39. In what environment are you most likely to see multiple defect management systems used in one project?

40. You are the Test Manager of a four-person test team working for a small distribution company with a single warehouse. Your team has been working with a third party development team on a new inventory management system. The company expects this system to generate approximately one million dollars per annum in profits for the company. Early in the project, various risks were identified, and steps taken to mitigate those risks.

For example, you sent your test team for training on the new system, and upgraded the test environment. There are still some lingering risks that have not been addressed, but they have been determined to have a low chance of occurring, with minimal impact if they do occur.

What would be the best option to mitigate these remaining risks? [3]

41. Which of the following statements is true regarding documentation standards? [2]

42. Which of the following aspects should test progress metrics be mapped to? [1]

43. Which testing metric identifies defect density? [1]

44. What is the primary use for the traceability information regarding the relationship between test results and test conditions during test execution? [2]

45. Which of the following Is considered a heavyweight risk-based testing technique?

46. What is the purpose of the defect management committee?

47. Consider the following scenario:

Your customer is closely involved in the development project. Requirements are communicated verbally and rarely written down. An iterative development model is being followed and time boxing is used to stay on schedule.

Which of the following statements is true? [3]

48. Most managers in your company consider the efforts of your test team valuable, while others see comprehensive testing as an unnecessary cost overhead to the SDLC.

What action could the Test Manager take to quantify the value of testing to the organization? [3]

49. You tend to be conservative in your project estimations because you know how many things can go wrong and extend the schedule. You manager is not happy with your estimates and thinks you are being too negative with your numbers and not trying hard enough.

Which estimation method should you use to provide your manager with a positive' number while still also providing the number you think is more realistic?

50. You feel that your team has become lazy when applying good software testing techniques. You have given each of them a challenge to take a different business rule and build a full decision table and then collapse that table You will then assess the results.

For this assessment, what competencies are you validating?


 

The ISTQB-CTFL Dumps (V13.02) Are the Most Current Materials for Learning: Check ISTQB-CTFL Free Dumps (Part 1, Q1-Q40) Online

Add a Comment

Your email address will not be published. Required fields are marked *