Passing the HPE Compute Solutions HPE0-S59 exam is a rewarding achievement, but it requires hard work and comprehensive preparation. To succeed, you’ll need to get the HPE0-S59 dumps, which test your knowledge and skills in crucial areas. The HPE Compute Solutions HPE0-S59 dumps from DumpsBase are among the top-quality tools available for understanding the HPE0-S59 exam objectives. Whether you’re taking the HPE0-S59 dumps (V11.02) for the first time or looking to enhance your score, these questions and answers can prepare you for success on your very first attempt. You can check our HPE0-S59 free dumps (Part 1, Q1-Q40) of V11.02 online. Then you can trust that with DumpsBase’s HPE0-S59 exam dumps, you’ll be fully ready to tackle the real exam with ease.

Continue to check our HPE0-S59 free dumps (Part 2, Q41-Q80) of V11.02 below:

1. 1.A Data Center Manager is tasked with designing a new infrastructure to support a large-scale VDI (Virtual Desktop Infrastructure) deployment.

Key requirements:

- High user density per rack unit (U).

- Support for high-performance graphics (GPUs) for power users.

- Simplified management for provisioning and updating hundreds of compute nodes.

- Future-proof design that allows for flexible resource allocation.

Which HPE solutions should the architect combine to create an optimal design that meets all these requirements? (Select all that apply.)

2. An IT Manager is reviewing the performance of a server hosting a growing e-commerce application. The server was provisioned 6 months ago.

Original Workload: 1,000 concurrent users

Current Workload: 5,000 concurrent users

Current Performance Metrics:

- CPU Utilization: 95% (Sustained)

- Memory Utilization: 40%

- Network I/O: 30%

- Storage I/O: 25%

Based on this scenario, what is the primary compute resource requirement that has changed and needs to be addressed?

3. A server is at the POST screen with the following error:

POST Error:

207-Invalid Memory Configuration - Memory configuration is not supported. System Halted.

The support technician has an implementation plan to resolve this.

What is the most likely action in that plan?

4. A server's RAID 5 logical drive went into a "Degraded" state after a drive failed. The administrator noticed the rebuild did not start automatically, even though a global hot spare was available. The issue was resolved by manually starting the rebuild in SSA.

To ensure this *manual intervention* is not required for future failures, what configuration must be modified?

5. A System Administrator is troubleshooting an intermittent, non-critical hardware issue on a server that is not generating any IML events. The administrator needs to gather in-depth, historical telemetry data about the server's configuration and component status over the last 7 days to identify any unusual patterns.

Which diagnostic tool is specifically designed to collect and store this type of comprehensive, historical telemetry data?

6. A System Administrator is using Intelligent Provisioning (F10) to set up a new HPE ProLiant server. The administrator needs to configure the storage array *before* installing the operating system.

Which option within the Intelligent Provisioning main menu provides access to the Smart Array configuration utility?

7. An implementation specialist has racked a new HPE ProLiant server and connected redundant power supplies to two different PDUs.

What is the *first* step the specialist should take to validate basic power and management functionality?

8. A Solution Architect is analyzing a server design for a workload that is 90% random-read I/O.

Solution Design:

- Controller: HPE Smart Array P408i-a (Cache + Battery OK)

- Logical Drive: RAID 5 (6 x 3.84TB SAS SSDs)

Advanced Configuration (via SSA):

- Cache Ratio: 90% Write Cache / 10% Read Cache

What is the primary design flaw that will cause a performance bottleneck for this specific workload?

9. A System Administrator is alerted to a performance issue on a server. The iLO 5 Health Summary shows the Smart Storage Battery status as "Failed". The Smart Array controller cache is now listed as "Disabled".

What is the correct action plan to restore performance? (Choose 2.)

10. A system administrator is analyzing a server in a "Degraded" state. The iLO Health Summary shows the "Storage" subsystem is the cause.

Which tool should the administrator use to get detailed information on the logical drives, RAID levels, and the status of individual physical drives?

11. A Storage Administrator is troubleshooting a database server. Users are reporting that queries are "timing out."

Performance Data:

- CPU Utilization: 20%

- Memory Utilization: 40%

- Storage Read/Write Latency: 120ms (Sustained)

- Storage IOPS: 300 (Low)

Storage Design:

- 6 x 10TB 7.2K SATA HDDs in RAID 6

What is the most likely bottleneck?

12. An IT Manager is reviewing a solution design for a server that will be repurposed.

Current Configuration:

- HPE ProLiant DL360 Gen10

- 2 x Intel Xeon-Gold 6240 (18 cores each)

- 512 GB RAM

New Workload:

- Single, large, memory-intensive database (e.g., SAP HANA)

- The database license is per-core.

- The database requires 768 GB of RAM to load in-memory.

What changes must be made to this server's configuration to meet the new compute resource requirements? (Select all that apply.)

13. A Storage Administrator is planning an upgrade for a server running VMware ESXi. The plan is to update the Smart Array P408i-a firmware *and* the ESXi smartpqi driver.

Where can the administrator find the *exact* validated pair of firmware and driver versions that are tested and supported by HPE?

14. A customer is planning a data center refresh and needs a 2U, dual-processor server that offers the *most* flexibility for internal storage, with options for up to 24 SFF drives. This server will be their main virtualization host.

Which HPE ProLiant model is the mainstream "workhorse" positioned for this balance of compute and storage flexibility?

15. A Storage Administrator needs to modify an existing RAID 1 logical drive to a RAID 10 logical drive to improve performance. Both arrays use an even number of disks.

What is the correct method to perform this configuration change using Smart Storage Administrator (SSA) on a supported HPE Smart Array controller?

16. A system administrator is configuring an HPE ProLiant Gen10 server for a high-frequency trading (HFT) application. The primary requirement is the absolute lowest CPU and memory latency.

Which "Workload Profile" setting in the System Utilities (F9) is the advanced configuration designed to meet this specific requirement?

17. A customer is planning to implement a new HPE ProLiant DL380 Gen10 server to run a database application. The implementation plan calls for the operating system to be installed on a high-speed, redundant device that does *not* occupy any of the 8 front SFF drive bays.

Which component must be included in the implementation plan to meet this requirement?

18. An implementation plan requires a 2U server to be physically installed in a 4-post rack.

Which component *must* be included in the plan to physically mount the server in the rack?

19. A system administrator is troubleshooting a server with an amber Health LED. The iLO 5 Health Summary page shows the "Fans" subsystem is "Degraded."

iLO Fan Status Page:

- Fan 1: OK

- Fan 2: OK

- Fan 3: Failed

- Fan 4: OK

- Fan 5: OK

- Fan 6: OK

- Fan Redundancy: Lost

What is the correct action plan to resolve this issue and restore redundancy?

20. A customer is planning to add a new, write-intensive database workload to an existing HPE ProLiant server. The server currently has a Smart Array controller with 4 HDDs in a RAID 5 array.

New Workload Requirements:

- High write IOPS

- Low latency

- Resiliency (must survive 1 drive failure)

How must the server's storage configuration be modified to meet this change in compute resource requirements?

21. A system administrator is performing an advanced configuration on a server's iLO 5. The goal is to set up a baseline for security and management.

Which iLO 5 feature allows an administrator to script and automate the configuration of iLO settings, such as user accounts, network settings, and security policies, across many servers?

22. A customer reports that a newly installed HPE ProLiant server is showing a "Degraded" health status in iLO.

The IML log shows the following:

Severity: Degraded

Class: Power

Description: Power Supply 1 Status: Not Present

Severity: Info

Class: Power

Description: System Power Redundancy: Lost

What is the correct action plan to resolve this "Degraded" state?

23. A customer is troubleshooting a server that will not boot.

The IML contains the following entry:

Severity: Critical

Class: Processor

Description: 216 - Uncorrectable Machine Check Exception (Processor 1, APIC ID 0x00)

What is the correct action plan? (Choose 2.)

24. A Storage Administrator is planning to update the firmware on an HPE Smart Array P408i-a controller. The server is running VMware ESXi 7.0 U3.

What is the *only* official HPE resource the administrator must use to validate that the new firmware version is compatible with the installed nhpsa driver version on ESXi?

25. After successfully installing VMware ESXi on an HPE ProLiant server, the administrator wants to validate that the hypervisor is properly communicating with the server's hardware (e.g., iLO, Smart Array).

What are the key indicators of a successful and fully functional installation? (Select all that apply.)

26. A Network Administrator is investigating slow file transfers to a server.

Performance Data:

- CPU Utilization: 10%

- Memory Utilization: 15%

- Network I/O: 120 MB/s (Sustained)

- Network Errors/Discards: High

Server Design:

- 1 x 1GbE Network Adapter (Single Port)

What is the performance bottleneck?

27. A field engineer is troubleshooting an HPE ProLiant server that is powered on but has a solid amber Health LED. The engineer does not have iLO access.

Which *physical* tool on the server is designed to provide a quick, visual, component-level diagnosis of the fault?

28. A solution architect is creating an implementation plan for a new HPE ProLiant DL380 Gen10. The customer requires that the server be populated with 1.5 TB of RAM.

Which components must be validated for compatibility in the implementation plan to meet this memory requirement? (Select all that apply.)

29. A Storage Administrator is installing a new HPE ProLiant Gen10 server. The customer has provided Red Hat Enterprise Linux 8.4 as the OS.

Which HPE resource must the administrator check to validate that RHEL 8.4 is officially supported on this server model?

30. A Storage Administrator is planning to change a Smart Array controller's mode from "RAID Mode" to "HBA Mode" to support a new VMware vSAN workload.

Scenario:

- Controller: Smart Array P408i-a

- Current Config: 1 x RAID 5 logical drive with data.

- Proposed Change: Switch to HBA Mode.

What is the *most critical* impact of making this configuration change?

31. A Storage Administrator has racked a new server and is performing the initial start-up. The server has an HPE Smart Array controller with a 4GB cache module, but the Smart Storage Battery is *not* yet installed.

What will the administrator observe when they enter Smart Storage Administrator (SSA) to create a logical drive?

32. An IT Manager is comparing HPE's on-premises management portfolio.

What are the key differences between HPE iLO Federation and HPE OneView? (Select all that apply.)

33. A Storage Administrator plans to add two new, identical physical drives to an existing, online 6-drive RAID 5 array to increase its capacity.

Scenario:

- Change: Add 2 new drives to a 6-drive RAID 5 array.

- Tool: Smart Storage Administrator (SSA) "Extend Logical Drive" function.

What is the potential performance impact on the server *during* this "Extend" operation?

34. A Storage Administrator is planning to apply an SPP (Service Pack for ProLiant) to a server running VMware ESXi. The SPP contains an updated firmware for the Smart Array controller.

Scenario:

- Current Driver: smartpqi.sys version 1.0.0

- SPP Firmware: Version 3.0

- SPP Support Matrix: Requires smartpqi.sys version 2.0.0 or later.

- Action: Administrator applies the SPP (firmware) but does *not* update the ESXi driver (VIB).

What is the potential impact of this change after the server reboots?

35. A system administrator is configuring an HPE ProLiant server with HPE Persistent Memory (NVDIMMs). The administrator needs to configure the NVDIMMs to provide the *fastest possible* storage (block mode) for an application.

Which "Goal" should the administrator select in the "Persistent Memory Configuration" utility within the System Utilities (F9)?

36. A Storage Administrator is performing an advanced configuration on an HPE Smart Array P408i-a controller to optimize it for a 100% read-intensive data warehouse workload. The controller has a healthy cache module and battery.

What is the optimal "Cache Ratio" setting in Smart Storage Administrator (SSA) for this specific workload?

37. A Storage Administrator sees the following alert in the IML:

Severity: Critical

Class: Storage

Description: Physical Drive in Port 1I, Box 3, Bay 2 has failed.

Logical Drive 1 (RAID 5) is now in a

Degraded state.

What is the correct immediate action plan?

38. A Storage Administrator is performing an advanced configuration on an HPE Smart Array controller using Smart Storage Administrator (SSA). The server will host a write-intensive database. The controller has a cache module and a healthy Smart Storage Battery.

To achieve the best possible write performance, which "Write Cache Policy" should the administrator set for the logical drive?

39. A solution architect is designing a server for a small remote office.

- The server will be standalone (no rack).

- The workload is light (file/print, small AD).

- Must be quiet.

- Must support 6 LFF (3.5-inch) drives for high capacity.

Which HPE server family and model should the architect select?

40. A Storage Administrator is planning to apply a new firmware update to an HPE Smart Array controller that is currently running a production workload.

Scenario:

- Server: HPE ProLiant DL380 Gen10

- Controller: Smart Array P408i-a (with Cache and Battery)

- Workload: Live VMware ESXi host

- Action: Apply controller firmware update using the online (in-OS) utility.

What is the *most likely* potential impact during the firmware flashing process, *before* the server is rebooted?


 

HPE7-S01 Dumps (V8.02) with Real Questions and Answers: Continue to Check Our HPE7-S01 Free Dumps (Part 2, Q41-Q60)

Add a Comment

Your email address will not be published. Required fields are marked *