Sharing ISTQB-CTFL Dumps (V13.02) to Help You Practice the Latest ISTQB-CTFL Exam Questions – Check ISTQB-CTFL Free Dumps (Part 3, Q81-Q120) Today

It’s your chance to complete the ISTQB Certified Tester Foundation Level (ISTQB-CTFL) exam. DumpsBase ISTQB-CTFL dumps (V13.02) have been verified as a valid resource for achieving success on the first attempt. Our dumps are designed to help you review important testing concepts, strengthen your knowledge, and prepare more efficiently for the ISTQB-Foundation Level certification exam. You can access the quality by reading our free dumps:

By checking these free demo questions, you can find that the most updated ISTQB-CTFL exam questions and answers in V13.02 are carefully organized according to the latest exam syllabus. They make you familiar with common question styles, key testing principles, and important exam topics. With the most current ISTQB-CTFL dumps (V13.02), you can improve your preparation and build confidence before taking the real ISTQB-CTFL exam.

Sharing More – ISTQB-CTFL free dumps (Part 3, Q81-Q120) of V13.02 – Helping You Check More:

1. Use Scenario 1 “Happy Tomatoes” (from the previous question).

When running test case TC_59, the actual result for t = 35 degrees Celsius is OUTPUT = X instead of the expected output.

Which information should NOT be included in the defect report?
2. Which ONE of the following options identifies the perspectives through which a collective authorship process generates a shared vision of user stories?
3. Which of the following statements about Experience Based Techniques (EBT) is correct?
4. The following requirement is given “Set X to be the sum of Y and Z”.

All the following four implementations have bugs.

Which one of the following bugs can be caught by Static Analysis?
5. Manager responsibilities in formal review includes ad except one of the following:
6. Consider the following list of activities (I to V):

I. Test design

II. Test planning

III. Review test basis

IV. Be a facilitator of a peer review

V. Test monitoring and control

Which ONE of the following options identifies the activities that the test management role is MAINLY focused on?
7. Which are the MAIN goals of risk management in a software project?
8. Which ONE of the following is a GOOD testing practice that is INDEPENDENT of the chosen SDLC (Software Development Life Cycle) model?
9. Consider the following iteration planning tasks where a tester can provide value:

Break down user stories into tasks (particularly testing tasks)

Estimate test effort for all testing tasks

Identify and refine functional and non-functional aspects of the test object Which ONE of the following tasks should be ADDED to the above list?
10. Which of the following tools is most likely to detect defects in functions or methods in source code?
11. Which ONE of the following options is NOT a benefit of test automation?
12. Which ONE of the following options BEST describes the third test quadrant (Q3)?
13. The testers in company A were part of the development team. Due to an organizational change they moved to be part of the support team.

What are the advantages and the disadvantages of this change?
14. How can testing contribute to higher quality?
15. Which of the following are valid testing principles?

I) Exhaustive testing is in general impossible.

II) Exhaustive testing should be executed for code intended to be reused.

III) Testing may guarantee that a program is correct.

IV) Testing cannot guarantee that a program is correct.

V) Defects cluster together in certain areas of the product.
16. Which of the following statements about re-testing and regression testing are TRUE?

I Re-testing should be performed after a defect is fixed.

II Regression testing should always be performed after a defect is fixed.

III. Re-testing and regression testing may be performed at any test level.

IV Regression testing may include functional, non-functional and structural testing.

V. Re-testing should be included in the debugging activity.
17. Which ONE of the following statements about maintenance testing is CORRECT?
18. Which ONE of the following options BEST describes a key characteristic of non-functional testing?
19. Which of the following is NOT an experience-based technique?
20. A test manager decided to skip static testing since he believes bugs can be found easily by doing dynamic testing. Was this decision right or wrong?
21. Which of the following statements about testware are correct?

I When closing the test activities, all the testware resources can be uninstalled and released

II All the testware should be subject to Configuration Management

III. The testware. at the end of the project, should be transferred to the organization responsible for maintenance

IV The developers are responsible for the correct installation of the testware
22. Which ONE of the following elements is TYPICALLY part of a test plan?
23. Which of the following should be included in a test status report?

I. Estimation details

II. Total number of open and closed defects

III Actual effort spent

IV. Defect reports

V. Number of executed, failed, blocked tests
24. Which of the following statements regarding inspection is NOT true?
25. Which of the following statements is LEAST likely to be describing component testing?
26. 4 equivalence classes are given for integer values:

0 < x <100

100<= x <= 200

200 < x < 500

x >= 500

Which of the following options represent correct set of data for valid equivalence class partitions?
27. A test engineer finds a defect while testing. After the developer has fixed the defect, the test engineer decides to re-run a complete section of the tests.

Which of the following is correct?
28. Which of the following does MOT describe a reason why testing is necessary?
29. Which ONE of the following tools would be MOST SUITABLE for facilitating the creation of test cases, test data, and test procedures?
30. In maintenance testing, what is the relationship between impact analysis and regression testing?
31. Which ONE of the following options corresponds to an activity in the testing process in which testable features are identified?
32. A system has valid input numbers ranging between 1000 and 99999 (both inclusive).

Which of the following inputs are a result of designing tests for all valid equivalence classes and their boundaries?
33. Which of the following statements about reviews are TRUE?

I. In walkthroughs the review meeting is typically led by the author.

II Inspection is characterized by an open-ended review meeting

III Preparation before the review meeting is part of informal reviews

IV Management rarely participates in technical review meetings
34. Which of the following can be considered a VALID exit criterion?

I Estimates of defect density or reliability measures.

II. The completion and publication of an exhaustive Test Report.

III. Accuracy measures, such as code, functionality or risk coverage.

IV Residual risks such as lack of code coverage in certain areas.
35. A team's test strategy was to invest equal effort in testing each of a system's modules. After running one test cycle, it turned out that most of the critical bugs were detected in one of the system's modules.

Which testing principal suggests a change to the current test strategy for the next test cycle?
36. Which ONE of the following statements about acceptance testing is NOT correct?
37. An Incident Management tool implements the following defect states;

Open, Assigned, Solved, Closed Consider the following defect report:

Id T000561

Test Object "Warehouse Management' application

Tester name; John Bishop

Date: 10th. April 2010

Test Case MRT558I

Status OPEN

Severity Serious

Priority

Problem- After inputting the Total Quantity item = 450 in the SV034 screen, the system shows an unexpected Error message=47

Correction:

Developer name:

Closing date:

Which of the following is a valid criticism of this report?
38. Which of the following is a function of a dynamic analysis tool?
39. Which of the following is the most important task of a typical test leader?
40. Use Scenario 1 “Happy Tomatoes” (from the previous question).

Using the Boundary Value Analysis (BVA) technique (in its two-point variant), identify the set of input values that provides the HIGHEST coverage.

 

ISTQB CT-AI Exam Dumps (V10.02) - Updated Materials for Your Certified Tester AI Testing (CT-AI) Certification Preparation

Add a Comment

Your email address will not be published. Required fields are marked *