The ISTQB-CTFL dumps (V13.02) from DumpsBase are extremely well and highly recommended by the experts, allowing you to smoothly synchronize your capabilities. All the practice questions and answers in V13.02 are valuable for your ISTQB-Foundation Level Exam preparation. By preparing for your ISTQB-CTFL exam with these valid and reliable dump questions, you can get the most impressive score on the exam. Before downloading the ISTQB-CTFL dumps (V13.02), you can choose to read our ISTQB-CTFL free dumps (Part 1, Q1-Q40) of V13.02 first. After testing these demo questions, you can clean your competencies through the guidance of the specialists, ensuring a successful outcome. You can utilize our most recent and cutting-edge readiness and gain excellent outcomes by picking the updated ISTQB-CTFL practice questions. Today, we will continue to share free demos online for testing more about the V13.02.

Continue to check our ISTQB-CTFL free dumps (Part 2, Q41-Q80) of V13.02 below:

1. A software system checks age in order to determine which welcome screen to display.

Age groups are:

Group I: 0-12

Group II; 13-18

Group III: over 18

Which of the below represent boundary values?

2. Which test approach will best fit a new project, with little documentation and high probability for bugs?

3. Software was found lo take much more time than the stated requirement of less than one second to save a file. Upon investigation it was found that there was an unnecessary check inside a loop which was slowing down the file-save operation.

The software not being able to meet the desired response time is an example of

4. Which of the following statements about test reports are TRUE?

I Test reports shall be approved by the test team.

II. Test reports shall give stakeholders information as basis for decisions.

Ill Test reports shall summarize what happened through a period of testing.

IV. Test reports shall be approved by the development team, the test team and the customer

V. Test reports shall include information about remaining risks.

5. Consider the following table, which contains information about test cases from the test management system:

Which ONE of the following options organizes the test cases based on the statement coverage strategy, while considering practical constraints?

6. Which ONE of the following options BEST describes black-box test techniques?

7. Which of the following statements about decision tables are TRUE?

I. Generally, decision tables are generated for low risk test items.

II. Test cases derived from decision tables can be used for component tests.

III. Several test cases can be selected for each column of the decision table.

IV. The conditions in the decision table represent negative tests generally.

8. Which of the following options cover the test types performed during typical system testing phase:

I. Usability

II Requirements based scenarios

III Testing parts of the code in isolation

IV Correct order of parameters in API calls

9. A state transition diagram describes a control system’s behavior in different operational modes. The initial state is “NORMAL MODE”.

Which ONE of the following test cases covers an INVALID sequence?

10. Which ONE of the following options CORRECTLY describes one of the seven principles of the testing process?

11. Which of the following is NOT a deciding factor m determining the extent of testing required?

12. Which type of software development product can undergo static testing?

13. A system computes prices for bus tickets. The price depends on

- the passenger type (baby, child, adult, senior citizen, student, military)

- the travelling type (as single or in a group)

- the distance (zone 1. 2. 3)

- the kind of transport (ordinary, express)

Which of the following test techniques is the most appropriate one for testing the price computation?

14. The following sentences refer to the 'Standard for Software Test Documentation' specification (IEEE 829).

Which sentence is correct?

15. Consider the following testing levels:

1) Component Testing

2) Integration Testing

3) System Testing

4) Acceptance Testing

Which of the following statements is true?

16. You need to test the login page of a web site. The page contains fields for user name and password.

Which test design techniques are most appropriate for this case?

17. Which of the following would be the LEAST likely to be used as the basis for a test exit criteria?

18. Scenario 2 “Big Drop”:

A company “The Big Drop” provides bulk discounts and frequent customer discounts as follows:

How many possible decision rules can be extracted from this table?

19. Which of the following is NOT an objective of testing?

20. Which ONE of the following elements is TYPICALLY NOT part of a test progress report?

21. Which of the following is an example of black-box dynamic testing?

22. Which of the following BEST matches the attributes with a level of testing?

I. Stubs and drivers are often used

II The lest environment should correspond to the production environment

III Finding defects is not the main focus

IV Testing can be based on use cases

V Testing is normally performed by testers

VI Testing for functional and non-functional characteristics

23. Which of the following is correct with regards to debugging?

24. Which ONE of the following work products TYPICALLY belongs to test execution?

25. A QA manager of a start-up company needs to implement within a week a low cost incident management tool.

Which of the following is the best option?

26. Which ONE of the following options is a PRODUCT risk and NOT a PROJECT risk?

27. Which of the following statements is not correct?

28. Consider the following list of possible benefits of retrospectives (A to D):

A) Team bonding and learning

B) Increased test effectiveness/efficiency

C) Improved quality of the test basis

D) Better cooperation between development and testing

... and the list of possible characteristics of retrospectives (1 to 4) that enable achieving these benefits:

The possibility of implementing suggestions for process improvement

The opportunity to raise problems and propose points for improvement

The regular review and optimization of the collaboration between team members

The possibility of addressing and solving deficiencies in the extent and quality of the requirements

Which ONE of the following options presents the BEST mapping between benefits and characteristics from retrospectives?

29. Consider the following statements (I to V) about software testing:

I. Can be applied to non-executable work products.

II. Can be used to measure performance efficiency. III. Can lead to the detection of defects.

IV. Can find defects directly.

V. Can identify unexpected behaviors caused by potential defects.

Which ONE of the following options is the list that characterizes static tests the BEST?

30. Which statement about use case testing is true?

31. For withdrawing money tram an Automated Teller Machine (ATM), the following conditions are required:

- The bank card is valid

- The PIN code is correct

- Money is available in the user's account

The following are some possible interactions between the user and the ATM:

- The entered card is invalid The card is rejected

- The PIN code is wrong The ATM asks for another PIN code

- The requested amount is more than available in the user's account: The ATM asks for another amount

- The requested amount is available in the user's account The ATM dispenses the money

Which test design technique should be used to cover all possible combinations of the in put conditions?

32. Which of the following is a key characteristic of informal reviews?

33. Which ONE of the following options BEST describes Behavior-Driven Development (BDD)?

34. The following incident report that was generated during test of a web application.

What would you suggest as the most important report improvement?

Defect detected date: 15 8.2010

Defect detected by: Joe Smith

Test level System test

Test case: Area 5/TC 98

Build version: 2011-16.2

Defect description After having filled out all required fields in screen 1, t click ENTER to continue to screen 2 Nothing happens, no system response at all.

35. Your organization's test strategy states that it is desirable to use more than one method for estimating test effort. You are responsible for estimating test effort for the next project. Based on historical data, the development-to-test effort ratio is 5:3.

The initial estimate for the development effort is 450 person-days.

Which ONE of the following options corresponds to the estimated test effort using the ratio-based method?

36. Which ONE of the following options BEST describes the purpose of confirmation testing versus regression testing?

37. Which of the following is true about Oracles?

38. 1.Which ONE of the following options is NOT a test objective?

39. Which of the following is NOT a common objective of testing?

40. Which ONE of the following activities TYPICALLY belongs to the planning phase of the review process?


 

Practice CT-SEC Dumps (V8.02) to Get Success: Check ISTQB CT-SEC Free Dumps (Part 3, Q81-Q100) Today