To succeed in the Interior Design Professional (IDPX) certification exam, you are highly recommended to get IDPX exam dumps (V8.02) from DumpsBase to start your preparation. We provide you with up-to-date, reliable, and high-quality exam questions, which are carefully crafted to maximize your chances of passing the IDPX exam with confidence. You may have read the IDPX free dumps (Part 1, Q1-Q40) from DumpsBase, and found that each question from V8.02 aligns with the latest IDPX exam topics. So, by learning these IDPX exam questions and answers, you will gain a deep understanding of the Interior Design Professional (IDPX) exam content. To help you check more about the quality, you can read more free dumps today.

Below are the IDPX free dumps (Part 2, Q41-Q70) for checking the quality:

1. The office manager for a client signed a contract for design services. However, the owner refuses to pay the design fee because the office manager did not have the authority to sign the contract. This is an issue of

2. A project is utilizing existing millwork with new custom countertops.

Who is responsible to field verify the existing conditions to generate shop drawings for the new countertops?

3. A university is renovating the restrooms (washrooms) of a dormitory built in 1963 and is required to reduce the water usage by 20%.

What is MOST important when specifying plumbing fixtures?

4. Which of the following is MOST likely to require a louvered door?

5. The project team is reviewing a mock-up of a faux plaster ceiling finish. The mock-up is a 4'x4' board on an easel in the contractor’s construction trailer.

What should the designer request?

6. A client wants to remove the gypsum board from an existing structural column and leave it exposed.

What implications might this have on the fire rating of the assembly?

7. In addition to the use of carpet on the floor, which of the following methods is the BEST solution to address the need for acoustical privacy in a conference room?

8. What is the MAXIMUM occupant load of a business occupancy with one exit?

9. A new hospital includes a cafeteria and a 60-person conference room.

Which occupancy classifications would apply?

10. What is the standard sequence of events for the permit process?

11. A client wants to convert a 10,000 sf [929 m²] retail facility into an office space.

What is the MOST important activity to do as a part of programming?

12. The client has approved a selection for lounge seating and has selected a COM fabric for its reception area.

What should the designer do NEXT?

13. When completing an analysis of the existing conditions for a two-story commercial building, what are some CRITICAL accessibility items to review?

14. A design firm located in Utah has been awarded a new construction project located in Toronto.

What building code and permit requirements must the design firm comply with when designing the project?

15. Which of the following installations would require a structural engineer to be involved?

16. A restaurant is designated as which occupancy classification?

17. Where open risers are permitted in a commercial space, what is the MAXIMUM clear space between risers?

18. Legislation that establishes guidelines of professional responsibilities for an interior designer is known as the

19. After completion of a project, the client spills coffee on their new lobby sofa. Where would the client look for information on how to remove the stain?

20. The conservation of water through landscaping with native plants and mulching is called

21. Allowances are included in contract documents when

22. During a substantial completion walk-through, a designer notices that a door was installed incorrectly.

What should the designer do NEXT?

23. What provision should a designer include in the contract to minimize liability in claims that arise from delays caused by other project members?

24. What should be addressed FIRST in a letter of agreement?

25. What is the MOST efficient lighting control system a designer can incorporate in a fifth floor, south-facing office suite?

26. What would be included as part of a fire separation (fire assembly)?

27. A contractor defaults on payments to a mechanical subcontractor. The subcontractor is protected and guaranteed payment by a

28. While on site, the designer notices that the glazing subcontractor is installing the storefront system in the wrong finish.

What should the designer do?

29. During a high school renovation project, the school board and several teachers each call the designer several times a week to request changes.

What is the BEST way for the interior designer to keep the project on schedule?

30. What is the MOST effective construction method to help mitigate impact noise from high heels on a hard floor surface?


 