Welcome to Dumpsbase.com

API-580 Dumps

Only $41.76, Automatic 28% OFF. More on Promotion page

$ 68
(235 Customer Reviews)
Exam Name

Risk Based Inspection Professional

Updated
2018-10-13
Q&A
140

Dumpsbase collected all the related API-580 dumps questions, which are the best and latest in the whole market. Read and study all Dumpsbase ICP ICP Programs API-580 exam dumps, you can pass the test in the first attempt.

1. How many Q&As in Dumpsbase API-580 dumps?

There are 140 Q&As in Dumpsbase ICP Programs API-580 dumps, which cover all the exam topics of API-580 Risk Based Inspection Professional.

2. Can I try free API-580 demo before I decide to purchase?

Yes, Dumpsbase provides free API-580 demo for you to check the quality of Risk Based Inspection Professional API-580 dumps.

3. What format will I get after purchasing API-580 dumps?

Dumpsbase provides both PDF and Software for ICP Programs API-580 dumps. 
PDF version is file which you can print out to read and study all the API-580 dumps questions anywhere, and you can also use mobile phone to study them. It is very convenient.
Software is a simulation version, you can test API-580 questions in real exam environment. 

4. How long will I get ICP Programs API-580 dumps after completing the payment?

After you purchase Dumpsbase ICP API-580 dumps, you will get Risk Based Inspection Professional API-580 exam dumps in 10 minutes in our working time, and in 12 hours in non-working time. 

5. If I fail API-580 exam with Dumpsbase dumps, will I get full payment fee refund?

Yes, if you fail ICP Programs API-580 by using Dumpsbase dumps questions, you only need scan and send the score report to us via [email protected] After we check and confirm it, we will refund full payment fee to you in one working day. 

6. Can I get update after I purchase API-580 dumps?

Yes, Dumpsbase provide free update for API-580 exam dumps in one year from the date of purchase. If your product is out of one year, you need to re-purchase API-580 dumps questions. Contact us by online live support or email, we will send you 50% coupon code. 
 

Question No : 1

Through__________________, inspection activities arefocusedonhigher risk items and away from lower risk items.
A. Rbi
B. Pha
C. Rem
D. Hazop
Answer: B

Question No : 2

The following assumption can bemade that significantly impact the calculated corrosion rate early in the equipment life
A. If the base line thickness were not performed the nominal thickness may be used for the original thickness
B. If original thickness not available, averaged ut thickness readings may be used
C. If the original thickness not available, maximum utthickness readings may be used
Answer: A

Question No : 3

The data validation step stresses the need for a knowledgeable individual.
A. To comparing data from the inspections to the expected deterioration mechanism and rates
B. To compare the results with previous measurements on that system
C. Similar systems at the site or within the company or published data
D. All of the above
Answer: D

Question No : 4

Following are the non-inspection mitigation actions except one
A. Replacement or upgrade
B. Equipment redesign
C. Maintenance of strict controls on operating conditions
D. Risk management by monitoring the deterioration
Answer: D

Question No : 5

If the material of construction and internal/external conditions are the same
A. Inspection results can be related from one equipment can be related to the other equipment
B. We cannot do that, since we do not know about it
C. Need to consult Equipment Engineer for final decision
Answer: A

Question No : 6

The type of failure mode that likely to occur due to ssc
A. Small holes to rupture
B. Small holes
C. Cracks
D. Only rupture
Answer: C

Question No : 7

When equipment has low deterioration rates as an inspector what you decide in lieu of internal inspection.
A. On-stream inspection
B. Out of service inspection
C. External inspection
Answer: A

Question No : 8

CORRECT TEXT
Rbi as an integrated management tool that complements.
Answer:
Pha and rcm

Question No : 9

A Rbi analysis shares many of the techniques and data requirements with a____________.
A. Qra
B. Pha
C. Hazop
D. Event tree
Answer: A

Question No : 10

In the event of a leak the potential failure of an isolation valve could
A. Increase the inventory
B. Decrease the inventory
C. No harm to inventory
Answer: A

Customer review

  • Moshe Polidoro

    27 Jun, 2018 5:42pm

    Thanks so much!! Your product rocks.

  • Moises Jurden

    26 Jun, 2018 9:06am

    So have passed my API-580 test successfully.

  • Luke Cargo

    24 Jun, 2018 4:44am

    I always wanted to get an update every time I prepare for my test.

  • Lloyd Edvalson

    24 Jun, 2018 3:55am

    Problems helped me to learn to apply concepts, and gain practice.

  • Mathew Roques

    23 Jun, 2018 10:13pm

    They are the latest new questions.

  • Stevie Hamson

    21 Jun, 2018 9:02pm

    You guys always rock!! Passed API-580 again with your training material.

  • Walter Ferrara

    19 Jun, 2018 1:34am

    Keep on this good work.

  • Ezequiel Cdebaca

    19 Jun, 2018 1:25am

    I just passed this API-580 exam.

  • Hans Bonilla

    17 Jun, 2018 11:30pm

    To my surprise, I found all the real questions from this dumps.

  • Harvey Coupland

    17 Jun, 2018 12:46pm

    The site API-580 practice questions are a big helper in my preparation.

  • Blake Mcclennon

    17 Jun, 2018 9:58am

    Will buy another exam from you soon.

  • Zane Jekel

    17 Jun, 2018 5:53am

    Thanks The site API-580 exam questions.

  • Dana Vanrossum

    15 Jun, 2018 11:12pm

    It is a good experience of business.

Some similar or invalid comments have been hidden.

Leave your Review

Your Rating